ULTRATUFF™ Double Garage Floor Kit, Border Chequer Infill
ULTRATUFF™ Double Garage Floor Kit, Border Chequer Infill
Border Chequer Infill layout on ULTRATUFF™ diamond-tread tiles. 240 tiles + 16 ULTRAEDGE ramps included. Details
Couldn't load pickup availability
- Free shipping Australia-wide
- Australian replacement warranty
- 40-day easy returns
- Australian owned — ships from AU
- Need help? 1300 148 799
In the garages of

Transform your double garage with the ULTRATUFF™ Border Chequer Infill Floor Kit — a durable modular floor covering 36 m² (6 × 6 m). Each kit contains 240 tiles (225 floor tiles plus 15 spares) and 16 ULTRAEDGE ramps for a complete, drive-on-ready result.
- Complete kit — a 6×6 m double garage floor in one box: 240 ULTRATUFF™ tiles (with 15 spares) and 16 ramps.
- Border Chequer Infill — framed ULTRATUFF™ edges with a bold chequer pattern filling the enclosed centre.
- Diamond-pattern traction — the solid ULTRATUFF™ surface provides steady grip while the raised diamonds shed surface moisture.
- Low maintenance — the solid ULTRATUFF™ surface sweeps and mops effortlessly. Side channels maintain airflow beneath the floor.
- 20t/m² load rating — every square metre of your ULTRATUFF™ Border Chequer Infill floor supports vehicles and heavy equipment. Sit jacks and stands on a pad or plate to spread the weight.
- Full DIY install — the ULTRATUFF™ snap-lock system connects tiles by hand pressure alone. Finish a double garage in 4–6 hours.
- Colour-stable and chemical-proof — UV-stabilised ULTRATUFF™ pigment holds true under prolonged sun. Oil, fuel, and brake fluid cause no damage.
- Relocatable investment — every ULTRATUFF™ tile lifts out and travels with you. Damage one? Replace that single tile, not the whole floor.
Technical Specifications
Installation Guide
What you'll need
- Tape measure
- Rubber mallet
- Jigsaw (for edge cuts)
- Marker or pencil
- Broom
Time estimate
- Single garage (20-25 sqm): 4-6 hours
- Double garage (40-50 sqm): 6-10 hours
- No curing time — drive on immediately
Installation steps
-
1
Start from the entrance
Begin laying tiles at the garage door corner. Leave a 5–10mm expansion gap at all walls.
-
2
Lay the first row
Complete your first row across the garage, clicking tiles together. The interlocking pegs and loops do the work.
-
3
Fit entrance ramps
Attach ramp trims to the first row and slide the row snug against the garage door.
-
4
Centre your design (optional)
If your design has a centred pattern, adjust the first row to leave equal gaps on both sides.
-
5
Lay remaining tiles
Continue laying rows towards the back and side walls, clicking each tile into the previous one.
-
6
Trim edges and finish
Cut edge tiles with a jigsaw, click them in, and your floor is ready to use immediately — no curing time.
Shipping
Free shipping Australia-wide on all orders.
Orders are dispatched from our warehouses in Melbourne, Sydney, or Brisbane within 1-2 business days. We ship from the closest warehouse to you for fastest delivery.
Standard delivery typically takes 3-7 business days depending on your location. Express shipping available at checkout for metro areas.
Warehouse Pickup
Pickup is available from our Melbourne, Sydney and Brisbane warehouses, by advance order only: place your order first and we will let you know when it is ready to collect.
Returns
We offer a 40-day hassle-free returns policy. If you are not completely satisfied with your purchase, contact our team and we will arrange a return. Items must be unused and in original packaging.
Warranty
All products come with an Australian replacement warranty covering manufacturing defects. If a product has a manufacturing defect, we will replace it free of charge including shipping.
15 boxes 240 tiles, 38.4 m²
Real garages, real customers
Real Aussie installs using this range — tap any photo to explore the build.